Up Construction begins on Maharishi Samadhi Smarak, Memorial of Total Knowledge Prev Next Slideshow

Slide32
Slide15
Slide18
Slide20
Slide16
  Slide21.jpg - The second level of construction refers to the outer structure of the building, which will be carved of yellow Jaisalmer stone.  
Slide22
Slide30
Slide42
Slide53
Slide50

28 July 2009
The second level of construction refers to the outer structure of the building, which will be carved of yellow Jaisalmer stone.
Image | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 |